Optimal Preventive Replacement Age of a Wearing Part: Weibull Cost Rate Curve (2D)
A fleet of ten wearing parts on a timeline plus the cost-rate curve C(T) of the age-replacement policy. The same Weibull renewal model as the 3D bay: shape, scale, planned and failure cost, the optimal age T*, and built-in numerical checks.
Ten machines each wear out a part with a Weibull lifetime. Choose when to replace it, planned at age T or after failure, and see the long-run cost per hour from the renewal-reward theorem, the optimal age T*, and the cost saved against running to failure. A Blender-built machine bay with live wear gauges, and numerical checks including a Monte Carlo renewal run.
A fleet of ten wearing parts on a timeline plus the cost-rate curve C(T) of the age-replacement policy. The same Weibull renewal model as the 3D bay: shape, scale, planned and failure cost, the optimal age T*, and built-in numerical checks.
2D · HTML5 Canvas 2D · 60 FPS target · runs fully client-side, no install