Fleet of ten wearing parts (wear bar = age / planned age)
Cost rate C(T) against planned replacement age

Optimal Preventive Replacement Age of a Wearing Part: Weibull Cost Rate Curve (2D)

Ten machines each wear out a part with a Weibull lifetime. Choose when to replace it, planned at age T or after failure, and see the long-run cost per hour from the renewal-reward theorem, the optimal age T*, and the cost saved against running to failure. A Blender-built machine bay with live wear gauges, and numerical checks including a Monte Carlo renewal run.

Made with 🟠 Blender