Mobile App Release Plan: Gantt Chart, Developer Load and Finish-Date Spread (2D)

The same plan as a flat Gantt chart with critical tasks in red and earliest-start outlines, a developer-load histogram against the capacity line and the live day cursor.

Algorithms & AI2DModerate60 FPS📱 Mobile-adapted🟠 Blender⇄ 3D version
Mobile App Release Plan: Gantt Chart, Developer Load and Finish-Date Spread (2D) ↗ Open standalone

A mobile app release plan is a dependency graph, not a checklist: backend APIs must exist before platform teams can build against them, offline sync needs auth, QA needs finished builds, and the store submission needs QA to pass on both platforms. This simulator turns the 13-task release plan into a live 3D Gantt chart and runs a resource-constrained project scheduling (RCPSP) list-scheduler against it — drag the Backend, iOS, Android and QA team-size sliders and watch the schedule re-solve, revealing the point past which extra headcount stops shortening the release and the plan is purely waiting on its critical path.

⚙ Under the hood

The same plan as a flat Gantt chart with critical tasks in red and earliest-start outlines, a developer-load histogram against the capacity line and the live day cursor.

Critical Path MethodResource-Constrained SchedulingPriority RulesMerge BiasProject Planning