🏗️ Construction Schedule: Critical Path, Crane Downtime and Monte Carlo (2D)

A bar chart of ten construction stages on a time axis, with the critical path in red, the spare time of the other stages in grey, whiskers from a Monte Carlo of uncertain durations and a green line for the deadline. Set the duration uncertainty, the crane downtime, the steel delivery delay, the crew productivity of the services stage and the deadline, and see the planned finish, the median and safe finish, the criticality of each stage and the chance to meet the deadline. The path calculation, a path enumeration, the sampler and the merge bias are checked numerically, with four in-page numerical checks.

Civil Engineering & Structural Mechanics2DModerate60 FPS📱 Mobile-adapted🤖 ChatGPT⇄ 3D version
Construction Schedule: Critical Path, Crane Downtime and Monte Carlo (2D) ↗ Open standalone
⚙ Under the hood

A bar chart of ten construction stages on a time axis, with the critical path in red, the spare time of the other stages in grey, whiskers from a Monte Carlo of uncertain durations and a green line for the deadline. Set the duration uncertainty, the crane downtime, the steel delivery delay, the crew productivity of the services stage and the deadline, and see the planned finish, the median and safe finish, the criticality of each stage and the chance to meet the deadline. The path calculation, a path enumeration, the sampler and the merge bias are checked numerically, with four in-page numerical checks.

critical path methodMonte Carlo scheduleconstruction riskcrane downtimeproject management