Mobile App Release Plan: Resource-Constrained Critical Path, Priority Rules and Merge Bias
A twelve-task mobile app release as a 3D Gantt table. See the critical path with an unlimited team, then limit the number of developers and let a priority rule (critical first, shortest, longest, most successors) schedule the tasks with a serial schedule generator. Compare the release date with the critical-path and work-content lower bounds, and add estimate uncertainty to see the merge bias and the 80 percent finish date from 400 Monte Carlo projects. Blender-built task slabs, phone and developers, with brute-force path enumeration, feasibility and closed-form merge-bias checks built in.
A mobile app release plan is a dependency graph, not a checklist: backend APIs must exist before platform teams can build against them, offline sync needs auth, QA needs finished builds, and the store submission needs QA to pass on both platforms. This simulator turns the 13-task release plan into a live 3D Gantt chart and runs a resource-constrained project scheduling (RCPSP) list-scheduler against it — drag the Backend, iOS, Android and QA team-size sliders and watch the schedule re-solve, revealing the point past which extra headcount stops shortening the release and the plan is purely waiting on its critical path.
A twelve-task mobile app release as a 3D Gantt table. See the critical path with an unlimited team, then limit the number of developers and let a priority rule (critical first, shortest, longest, most successors) schedule the tasks with a serial schedule generator. Compare the release date with the critical-path and work-content lower bounds, and add estimate uncertainty to see the merge bias and the 80 percent finish date from 400 Monte Carlo projects. Blender-built task slabs, phone and developers, with brute-force path enumeration, feasibility and closed-form merge-bias checks built in.
3D · Three.js / WebGL renderer · 60 FPS target · runs fully client-side, no install