Home▸Climate, Ecology & Environment▸Levelized Cost of Electricity: Cost Stack and Capacity-Factor Curve (2D)

Levelized Cost of Electricity: Cost Stack and Capacity-Factor Curve (2D)

The same levelized-cost model as a 2D cost stack with solar and turbine renders, a discounted-energy curve and a live LCOE-versus-capacity-factor plot.

Climate, Ecology & Environment2DModerate60 FPS📱 Mobile-adapted🟠 Blender⇄ 3D version
Levelized Cost of Electricity: Cost Stack and Capacity-Factor Curve (2D) ↗ Open standalone

Find the price per MWh at which a power plant just pays for itself. Set the capital cost, operation and maintenance, capacity factor, discount rate, lifetime and yearly output loss, then watch a Blender-built solar field and wind turbine spin up beside a stacked cost column. The capital recovery factor, the exact discounted figure and numerical checks of both are built in.

⚙ Under the hood

The same levelized-cost model as a 2D cost stack with solar and turbine renders, a discounted-energy curve and a live LCOE-versus-capacity-factor plot.

LCOELevelized CostCapacity FactorDiscount RateRenewable Energy

2D · HTML5 Canvas 2D · 60 FPS target · runs fully client-side, no install

What did you find?

Add reproduction steps (optional)