Vertiport Capacity Planning — 2D Top-Down Ops View
A 2D top-down vertiport ops board: eVTOL air-taxis approach, land, fast-charge, and depart. Tune passenger demand, pad count, charger power, and boarding dwell to watch queues and throughput respond live.
Planning an eVTOL air-taxi network is fundamentally a queuing-and-energy problem: how many landing pads does a vertiport need, and how much fast-charging power keeps the fleet turning around fast enough to meet demand? This is a native 2D top-down counterpart to the 3D vertiport lab — the same turnaround math, drawn as an ops board with a holding ring instead of a rendered rooftop scene.
2D top-down counterpart to the 3D vertiport lab: watch eVTOLs approach, land, board, fast-charge, and depart as you tune passenger demand, pad count, charger power, and boarding dwell — turnaround time and utilization update live.
2D · HTML5 Canvas 2D · 60 FPS target · runs fully client-side, no install