Wind Farm Collection Cable: Kelvin Law, Conductor Size, String Loss and Loss Factor
Connect a row of wind turbines to a substation with one radial cable and find the cheapest conductor. Current builds up along the string, so I squared R loss grows like n(n+1)(2n+1)/6; a Weibull wind regime sets the loss factor; and Kelvin's law puts the economic cross-section where the capital cost of copper equals the cost of the lost energy. Change turbine count, spacing, voltage, energy price, wind and conductor to see the cost curve, thermal limit and voltage drop. Blender-built turbines and substation with numerical checks built in.
Connect a row of wind turbines to a substation with one radial cable and find the cheapest conductor. Current builds up along the string, so I squared R loss grows like n(n+1)(2n+1)/6; a Weibull wind regime sets the loss factor; and Kelvin's law puts the economic cross-section where the capital cost of copper equals the cost of the lost energy. Change turbine count, spacing, voltage, energy price, wind and conductor to see the cost curve, thermal limit and voltage drop. Blender-built turbines and substation with numerical checks built in.
Connect a row of wind turbines to a substation with one radial cable and find the cheapest conductor. Current builds up along the string, so I squared R loss grows like n(n+1)(2n+1)/6; a Weibull wind regime sets the loss factor; and Kelvin's law puts the economic cross-section where the capital cost of copper equals the cost of the lost energy. Change turbine count, spacing, voltage, energy price, wind and conductor to see the cost curve, thermal limit and voltage drop. Blender-built turbines and substation with numerical checks built in.
3D · Three.js / WebGL renderer · 60 FPS target · runs fully client-side, no install