Home▸Energy & Thermodynamics▸Merit-Order Staircase: Cheapest Plants First, Demand Marker and Clearing Price over a Day (2D)

Merit-Order Staircase: Cheapest Plants First, Demand Marker and Clearing Price over a Day (2D)

The fleet lined up in merit order with live output and marginal-cost bars, and the classic supply staircase against demand with the clearing price. The same hourly dispatch model and numerical checks as the 3D scene.

Energy & Thermodynamics2DModerate60 FPS📱 Mobile-adapted🟠 Blender⇄ 3D version
Merit-Order Staircase: Cheapest Plants First, Demand Marker and Clearing Price over a Day (2D) ↗ Open standalone

A fleet of nuclear, lignite, hard-coal, gas CCGT and peaker plants, plus solar, wind and hydro, serves a city through one day. Change peak demand, solar and wind capacity, cloud cover, wind speed, gas, coal and carbon prices and nuclear availability and watch the plants re-sort by marginal cost, the marginal plant set the price, the duck-curve residual load move and coal and gas swap places at the switching carbon price. A Blender-built power park with a live board, and numerical checks built in.

⚙ Under the hood

The fleet lined up in merit order with live output and marginal-cost bars, and the classic supply staircase against demand with the clearing price. The same hourly dispatch model and numerical checks as the 3D scene.

Merit OrderElectricity MarketMarginal CostCarbon PriceResidual Load

2D · HTML5 Canvas 2D · 60 FPS target · runs fully client-side, no install

What did you find?

Add reproduction steps (optional)