Home▸Cybersecurity▸Information Security Management System Risk Register

🛡️ Information Security Management System Risk Register

Interactive 3D simulation of an ISO/IEC 27001 Information Security Management System: information assets drift toward or away from an acceptable-risk boundary as Annex A control investment battles rising threat pressure, while a periodic audit sweep flags which assets are currently non-conformant.

Cybersecurity3DModerate60 FPS📱 Mobile-adapted🟠 Blender⇄ 2D version
Information Security Management System Risk Register ↗ Open standalone

ISO/IEC 27001 certifies an organisation's Information Security Management System (ISMS): a continuous cycle of identifying information assets, assessing the risk to each one, selecting and applying controls from Annex A to bring that risk down to an acceptable level, and running a regular audit programme to verify the controls are actually working. This simulation visualizes a live risk register — assets drift toward or away from an acceptable-risk boundary as you tune control investment against threat pressure, while a periodic audit sweep exposes exactly which assets would fail a compliance check right now.

⚙ Under the hood

Interactive 3D simulation of an ISO/IEC 27001 Information Security Management System: information assets drift toward or away from an acceptable-risk boundary as Annex A control investment battles rising threat pressure, while a periodic audit sweep flags which assets are currently non-conformant.

Three.jscybersecurityISO 27001risk managementcomplianceauditGordon-Loeb modelsecurity investmentrisk matrixeconomics

3D · Three.js / WebGL renderer · 60 FPS target · runs fully client-side, no install

What did you find?

Add reproduction steps (optional)