Reservoir Mass Curve and Fullness: Sequent-Peak Storage over a 60-Year Record (2D)
The same reservoir model as a cross-section with a mass curve of cumulative inflow against demand, plus a 60-year fullness trace with failure months in red.
Size a water-supply reservoir the classic Rippl way. Set the demand, the month-to-month variability, the persistence of wet and dry spells and the seasonal swing of a synthetic 60-year river record, then watch a Blender-built dam and lake fill and drain while the sequent-peak storage, reliability and shortfall are computed. Numerical checks of the mass-curve method are built in.
The same reservoir model as a cross-section with a mass curve of cumulative inflow against demand, plus a 60-year fullness trace with failure months in red.
2D · HTML5 Canvas 2D · 60 FPS target · runs fully client-side, no install