Mass Timber Carbon Payback: Pools of Harvested Carbon over 150 Years (2D)
A stacked-area picture of where the harvested carbon sits over 150 years, with the forest and building drawn above and the net benefit curve below. The same shared model as the 3D scene, with built-in numerical checks.
A stand is harvested to build a mass-timber building, and the carbon ledger runs for 150 years. Chapman-Richards regrowth refills the forest, residues rot, the building stores carbon until demolition, and the net benefit against a concrete-and-steel reference can dip into a temporary carbon debt before recovering. Change the building size, reference emissions, sawmill yield, regrowth rate and shape, and building life. Blender-built building and forest, with numerical checks built in.
A stacked-area picture of where the harvested carbon sits over 150 years, with the forest and building drawn above and the net benefit curve below. The same shared model as the 3D scene, with built-in numerical checks.
2D · HTML5 Canvas 2D · 60 FPS target · runs fully client-side, no install