Home▸Civil Engineering & Structural Mechanics▸Canal Summit Water Budget Planner: Reservoir, Feeder and Side Pond — 2D Reservoir Section and Season Planner

💧 Canal Summit Water Budget Planner: Reservoir, Feeder and Side Pond — 2D Reservoir Section and Season Planner

2D companion of the canal summit lock: side-on section of the summit reservoir, lock, side pond and weir with a live 90-day season, daily water budget, lock capacity and how long the store lasts, using the same budget model as the 3D page.

Civil Engineering & Structural Mechanics2DEasy60 FPS📱 Mobile-adapted⇄ 3D version
Canal Summit Water Budget Planner: Reservoir, Feeder and Side Pond — 2D Reservoir Section and Season Planner ↗ Open standalone
⚙ Under the hood

2D companion of the canal summit lock: side-on section of the summit reservoir, lock, side pond and weir with a live 90-day season, daily water budget, lock capacity and how long the store lasts, using the same budget model as the 3D page.

HydraulicsCivil EngineeringWater BudgetCanalsBlender 5.2

2D · HTML5 Canvas 2D · 60 FPS target · runs fully client-side, no install

What did you find?

Add reproduction steps (optional)