Machine and ground
Traffic lane above
Model checks
The science
The machine
The cutterhead removes ground at a specific energy SE (J per m³ of bank), so torque and power are tied by SE = 2πT/(A p), with p the advance per revolution. The dig speed is the smallest of three limits: power (η P / SE), cutter penetration (A pmax n) and muck removal (conveyor capacity / bulking factor). Then the machine works stop-and-go: dig one ring (length L), erect the lining ring with a single erector, and only restart after the part of the erection that cannot overlap with digging: advance = L / max(tdig + (1 − o) tring, tring). The animation steps exactly this cycle.
Face and ground
Support pressure at the face is compared with the Rankine active earth pressure at the axis, σa = σv Ka − 2c√Ka; below it the volume loss is multiplied and the trough grows. The surface settlement above the tunnel is the empirical Gaussian trough S(x) = Smax exp(−x²/2i²) with trough width i = K z and Smax = Vs/(i√(2π)), Vs = VL × A; along the drive the settlement builds up behind the face as a cumulative normal. The section is drawn to scale, the settlement is exaggerated by the factor shown.
Traffic
A lane carries at most q = v / (s0 + Lv + v h) vehicles per second, where h is the mean time headway; platoons of n vehicles with a short inner headway lower the mean headway h = ((n−1) tp + tr)/n. The road above is a time-stepped car-following ring, independent of the formula; its flow at each density is plotted against the triangular fundamental diagram.
Honest simplifications: all soil parameters, specific energies, trough constants, shield friction and the metro headway are illustrative orders of magnitude, not a design; no groundwater, grout, buildings or tunnel-lining structural analysis; the cutter-force relation is a simple geometric one; the lane is a single-lane ring with a plain car-following rule; and the road window shown is only part of the ring. This 2D view shares its physics module with the 3D lab. Not an engineering design tool.
What to try
- Erect rings while digging: the overlap slider lifts the advance rate sharply because the erector is no longer idle time.
- Muck-limited then drag the conveyor slider: the advance climbs until another limit takes over (graph 2).
- Soft clay, face pressure too low: the arrows turn red and the trough deepens.
- Autonomous platoons against Rush hour: watch the car colours and the capacity bars.