Gas flows from the burner end to the exhaust end while the solid moves the other way. Conversion only starts once the solid passes about 810 C, so a short warmup gives rejects.
Controller
Inject faults
Model checks
The science
What is modelled
A chain of twelve zones. Each zone has a gas, a solid and a shell temperature that relax towards each other with fixed time constants; gas is transported from the burner end towards the exhaust, solids the other way at a rate set by the rotation speed. Conversion of the solid follows a first-order rate that switches on between 810 C and 1250 C. A sequence controller steps OFF, PRECHECK, PURGE, IGNITE, WARMUP, RUN, COOLDOWN and latches TRIPPED when a permissive is lost.
Equations
dTgas,i/dt = f (Tgas,i+1 - Tgas,i)/τg - (Tgas,i - Tsolid,i)/τx - (Tgas,i - Tamb)/τlosswith fan factor f.dXi/dt = ri(1 - Xi) / 2100 s,ri = clamp((Tsolid,i - 810)/440, 0, 1).- Fuel energy:
E = ∫ (fuel%/100) · 1.8 MW dt.
Checks run in the page
- The start sequence time equals precheck + purge + flame proving.
- Interlocks refuse a start with the door open or low airflow.
- Product plus rejects equals the fed mass, and the fuel energy matches an independent sum.
- An idle kiln stays at ambient; a firing kiln is hotter at the burner end.
Honest simplifications
A lumped educational model with illustrative time constants and a fixed 1.8 MW firing rate. It is not a calibrated kiln model, not certified burner-management software and not a safety design.
What to try
- Let the start sequence run, then tick Flame detector lost and watch the fuel isolate.
- Pick Weak draft: the start is denied because airflow is below the 60 % permissive.
- Raise the process time scale to see warmup and cooldown in a few seconds.