◈
TERMINUS / 07ORBITAL SYSTEMS LABORATORY
LEO ENGINEERING TESTBED / 400 KM
MISSION 07 / SYSTEMS INTEGRATION

Keep the station alive.

Power · thermal control · atmosphere

SUNLIGHT
T+ 00:00:00
ORBIT 01 / 92.4 MIN
DRAG / ARROWS TO ORBIT · SCROLL / PINCH TO ZOOM SCHEMATIC EARTH SCALE
SYSTEMS NOMINAL
SOLAR OUTPUT
— kW

Array incidence

BATTERY RESERVE
— %

24 kWh capacity

CABIN TEMPERATURE
— °C

Target 18–27 °C

CARBON DIOXIDE
— ppm

Training target < 2000 ppm

02 / LIVE RECORDER

Systems history

Battery energyLAST 2 ORBITS · SIMULATED TIME
TERMINUS / SCIENCE GUIDE

Engineering in orbit

At 400 km altitude, a circular orbit takes about 92.4 minutes. When the spacecraft passes behind Earth, its solar arrays stop generating power. The battery supplies the station until sunlight returns.

Electrical balance

Solar power = irradiance × collecting area × efficiency × cos(pointing error) × cos(beta), with a binary eclipse mask. This models a simplified single-axis tracking constraint. Battery charging and discharging have distinct efficiency and power limits.

Thermal control

The cabin is a single thermal mass. Equipment and crew add heat; a simplified radiator loop rejects heat according to pump setting, electrical availability and cabin temperature.

Atmosphere

Crew exhale CO₂ at a constant rate. The scrubber removes it at a concentration-dependent rate, limited by its setting and electrical availability. The pressure and air volume are fixed.

Experiment

Load a scenario, correct the failing system and maintain the training thresholds for 30 accumulated simulated minutes. The chart records actual model values. Use 300× or 900× to investigate an entire orbit quickly.

Read the included article.md for equations, assumptions, deployment and limitations. Earth is visually compressed, station architecture is fictional, and the training limits are not medical or operational requirements.

Made with 🤖 ChatGPT · Three.js