✳
THE VECTIS PROJECT / MYSIMULATOR.UK
OFFSHORE 100
SIMULATION RUNNINGNORTH ATLANTIC · DIGITAL TWIN
DAY 01 · 12:00 UTC
◈
VECTIS-100 WIND CLUSTER100 KM² CONTROLLED OCEAN ENVIRONMENT
✥
N
DRAG TO ORBITSCROLL TO ZOOMSHIFT + DRAG TO PANCLICK TO INSPECT
LOD 0 · 0 Draws · WEBGL2
✳
INITIALIZING OFFSHORE MODELLoading geometry, material textures and physics…
VECTIS / OPERATOR FIELD GUIDE

Explore a 10 km × 10 km virtual offshore wind park with 256 simulated 18 MW wind turbines, 4 offshore substations, 260 cable runs, 3 working service vessels and two dockyards.

Numerical results are engineering-inspired illustrative approximations, not an IEC-certified turbine digital twin or marine weather forecast.

Made with 🤖 ChatGPT · Three.js