A Blender-built alpine hydro station: a Manning headrace feeds a forebay, a sluice gate and emergency weir spill the excess, and a lossy penstock drives a Pelton runner. Change river stage, head, penstock diameter, nozzle size, turbine gate, sluice opening and load profile and watch the forebay level evolve, find the gate that gives maximum power, and try a load rejection. Numerical checks of the hydraulics are built in.