BUCZYNIEC / S–490THE ELBLĄG CANAL LABORATORY
WARMIA–MASURIA · POLAND/INTERACTIVE HERITAGE ENGINEERING
LOCAL / OFFLINEv1.0
LIVE 3D / FREE CAMERA
CAMERA
ENGINEERING VISUALISATION · VERTICAL EXAGGERATION 2.52×
↗LIVE TRANSPORT STATEHydraulic
elevation
CARRIAGE A POSITION
5.5%
LINE SPEED
0.00m/s
UPHILL · POSITIVE
VERTICAL ELEVATION
1.13m
OF 20.62 METRES
ELAPSED / SIM TIME
00:00
SIMULATED CLOCK
Two-track transport principle

One steel-rope drum moves both wagons in opposite directions. Select a highlighted object in the viewer to inspect its role in the system.

19TH-CENTURY SYSTEM
CONTEMPORARY EDUCATIONAL MODEL
Made with 🤖 ChatGPT · Three.js