A hydraulic toy model of how daily load builds up and how sleep, breaks and support drain it away.
The science
Time t is in hours. Two coupled first-order equations:
dS/dt = L(t) - k(t) S strain S builds with load L and relaxes at rate k.
dR/dt = -c S R + b rho(t) (1 - R) reserve R (0..1) is drained in proportion to strain and refilled by rest.
k = (k0 + k1 rho)(1 + s Sp), with rest level rho = 1 asleep, 0.12 + 0.3 x breaks awake, and Sp the support level. Constants: k0=0.05/h, k1=0.5/h, s=0.6, c=0.02, b=0.12/h.
It is the same structure as sleep-debt and fitness-fatigue (Banister) impulse-response models: a quantity that charges with input and discharges exponentially, plus a slower resource it consumes. Real psychology is far more complex and individual; the numbers here are illustrative, not fitted to data.
Integration: RK4, step 0.25 h. Workdays 09:00-17:00; waking at 07:00.