Ore Reconciliation 2D: Model vs. Measured Tonnage & Grade

A live 2D mine-to-mill reconciliation simulator: each mined block carries a block-model prediction and a truck-scale/plant-assay measurement, and you control the dilution, ore-loss and block-model bias that pull them apart. A scrolling tonnage chart compares modeled vs. measured blocks period by period, a trend chart tracks the tonnage, grade and metal reconciliation factors converging toward — or drifting away from — the 100% line, and the side panel keeps a running scorecard of exactly how much material and metal the operation is losing or gaining against its own model.