THEIS PUMPING TEST · EXTENSION LAB
Recovery Test Lab
Stop pumping and observe residual drawdown recovery. Compare the exact Theis recovery response with the time-ratio representation.
Pumping and recovery timelineThe pump stops after the selected pumping duration
Residual drawdown vs t / t′Theis recovery representation
Current residual drawdown
—
metres
Time ratio t / t′
—
—
Test phase
—
After pump-off, residual drawdown is computed by superposition: the original pumping well plus an equal-rate imaginary recharge well at the same location. The formula assumes constant pumping rate until shutoff.