THEIS PUMPING TEST · EXTENSION LAB
Challenge Lab
Solve practical pumping-design missions. Meet a water-supply target while keeping drawdown below a specified environmental or operational limit.
Drawdown at the protected receptorThe horizontal line is the permitted drawdown limit
Mission brief
—
Adjust the design and check whether both constraints are met.
Predicted drawdown
—
metres
Supply margin
—
m³/day
Drawdown margin
—
metres
This challenge is a simplified design exercise under idealised Theis assumptions. The aquifer properties and test duration are fixed by each mission; the learner chooses pumping rate and receptor distance.