CARRIAGE SPEED 01
0.00m/s
0.00 km/h
ELEVATION GAIN 02
4.40m
of 22 m modeled rise
WATER POWER 03
9.23kW
nominal available drive power
WATER CONSUMED 04
0.0m³
cumulative model volume
PERFORMANCE MONITOR
LIVE TELEMETRYSpeed response / m·s⁻¹
EARLIERMODEL TIME →NOW
Water, gravity, and steel.
Two carriages travel in opposite directions on a coupled cable system. Flowing water supplies the power needed to overcome load imbalance, rolling resistance, and the applied brake.
Pavailable ≈ ρgQHη
REDUCED-ORDER TEACHING MODEL