Basin plan: lake, dam, river, town, fields
Today's water budget (m3/s)

River Basin Water Allocation Map (2D)

Run a whole river basin for years: rain falls on an 8,600 km2 catchment, the Budyko curve turns it into river flow, a linear catchment store routes it into a 1 km3 reservoir, and the operator splits the water between the environment, the town, irrigated farms, hydropower and flood protection. Change annual rain, its seasonality and storminess, warming (potential evaporation), the flood-control pool, turbine capacity, adaptation investment, irrigated area and town size, and watch the lake rise and fall behind a Blender-built dam, the river stage follow Manning's formula, floods reach the fields, and the supply, energy and flood-day tallies. Fourteen numerical checks cover the Budyko runoff, mass balance, the catchment store against RK4, Manning depth, hydropower energy and the allocation priority.

Made with 🟠 Blender