MY SIMULATOR / WINMASTER LABSCUPRAVA.
Mufulira district · Copperbelt, Zambia 12°32′S / 28°14′E
LIVE PROCESS VISUALISATION / UNIT 04

The Mufulira Ore Lens

● READY
◈
Preparing the plantInitialising the Three.js renderer and procedural environment…
ISOMETRIC / YARD VIEW
0 ROCKS SCANNED
DRAG TO ORBIT · SCROLL / PINCH TO ZOOM · RIGHT-DRAG TO PAN
60 FPS TARGET
SIMULATED SHIFT00:00 / 12:00
02 — LIVE LAB RESULTS

Separation performance

RecoveryProduct grade
0 MINSIMULATED TIME12 MIN
03 — ENGINEERING CHALLENGE

The clean split

Meet all six conditions at the end of the 12-minute trial.

SHIFT ASSESSMENT0 / 100
Made with 🤖 ChatGPT · Three.js