SIMULATION / INDUSTRIAL / CLIMATE ENGINEERING / CB-07
LIVE PROCESS MODEL
MEGAFACILITY / 24.0 km² / 4,800 × 5,000 m
Engineering a permanent carbon sink.
Direct air capture. Pressurized mineral chemistry. Verified mass flows.
CO₂ CAPTURED—TONNES / HOUR 01
MINERALIZED—TONNES / HOUR 02
POWER CONSUMPTION—MEGAWATTS 03
NET REMOVAL—TONNES CO₂ / HOUR 04
VIEWPOINT
ASSET INSPECTION
PLANT REGION
ACTIVE MODULES
INLET AIRFLOW
OPERATING STATE
PROCESS TELEMETRYCAPTURE / POWER
CO₂ capture Power MW— Mt/yr
◉ ENGINEERING PROCESS FLOWREAL-TIME · BALANCED MASS MODEL
⟶
⟶
⟶
⟶
DRAG ORBIT · SCROLL ZOOM · WASD PAN · CLICK INSPECT · F WALK
SCENE INITIALIZING