WATER MANAGEMENT / INTERACTIVE ENGINEERING LAB
Polder Drainage Digital Twin
A living miniature of the Vistula Delta: balance rainwater, transfer flow between polders, and pump against a changing river level.
SIMULATION PL–ZUL–02
MODELLING STANDARD EDUCATIONAL
MODELLING STANDARD EDUCATIONAL
POLDER A LEVEL
−0.58 m
FIELD DISTRICT POLDER B LEVEL
−0.55 m
VILLAGE DISTRICT TOTAL PUMP FLOW
0.0 m³/s
MAX INSTALLED 8.6 M³/SEMBANKMENT STATUS
NORMAL
CLEARANCE TO CRESTHYDROLOGICAL TELEMETRY
Water elevation history
Polder A Polder B Crest B
VOLUME ACCOUNTING
Water balance
Accumulated inflow0 m³
Evacuated by pumps0 m³
Spill to surroundings0 m³
Mass-balance error0.00 m³
Two conservation-of-volume reservoirs · 12-second numerical substeps