Concrete placed 0.00 m³ of 8.80 m³ slab volume
Average depth 0 mm 220 mm design depth
Slab coverage 0% Pump ready · 12× training time
Drag to orbit · scroll to zoom · click the slab to guide the hose

The pump rate, concrete slump, boom position and placement mode affect the visible stream, spread radius, poured volume and slab coverage. The simulation runs twelve times faster than a real pour.