Chvorinov's rule
ts = B (V / A)n
The solidification time ts scales with the square of the casting modulus M = V/A. The model uses n = 2, a common textbook approximation. With modulus in centimetres, B is entered in min/cm².
Geometric moduli
Mplate = Vc / Ac
Mriser = (πD²H/4) / (πDH + πD²/4)
Mneck = d/4
The plate is a rectangular section. The riser is a cylinder with its base excluded from mould-contact area because it joins the neck. The neck is treated as a cylinder cooled along its side wall.
Feed reserve
Vusable = ηVr max(0, 1 − tc/tr)
Vdemand = βVc
The reserve estimate uses an illustrative efficiency η = 0.45 and a linear remaining-liquid approximation. It is a simple volume budget, not a solved liquid-flow or mushy-zone model. The neck must also remain liquid beyond the casting freeze time.
What is simplified
The model does not solve transient heat conduction, latent heat, alloy phase diagrams, mould permeability, metallostatic pressure, turbulence, feeding distance, oxide films or the shape of shrinkage porosity. The shell and liquid core in the cutaway are scaled visual cues, not a computed temperature field. The default dimensions, shrinkage fraction, efficiency and mould constant are illustrative; the exponent and Chvorinov relationship are textbook model choices.
Use this as a first-principles teaching model, not as a production foundry design calculation.