RIGLINE.THE CRANE CABLE LABORATORY
INTERACTIVE ENGINEERING / KS3FIELD SERIES 01 / 2026
STRUCTURES / FORCES / MOMENTS

Lift smarter.
Think in forces.

A crane is a lesson in leverage. Move the load, raise the backstay, and discover exactly when a safe lift becomes a risky one.

ENGINEERING LOGBOOK№ 014Explore · Measure · Solve
01THE TEST RIG
3D VIEW•DRAG TO ORBIT
BACKSTAY
—°
TENSION
— kN
PAYLOAD
— kg
AXONOMETRIC / RIG #01
ORBIT ↔ · SCROLL TO ZOOM · DOUBLE CLICK TO RESET
BACKSTAY TENSION
0.00kN
CABLE UTILISATION
0%
AVAILABLE MARGIN
0.00kN
ENGINEERING CHECK
WITHIN LIMIT

Winch motion is quasi-static: accelerations are neglected.

03DRAGGABLE FORCE DIAGRAM
SIDE ELEVATION
DRAG ● HOOK OR ● ANCHOR · ARROW KEYS ALSO WORK
HOOK: 4.6 mθ 33°RISE: 4.5 mT = 0 kN
LOAD MOMENT—kN·m
JIB MOMENT—kN·m
HINGE FORCE ↑—kN, signed
04THE SAFETY ENVELOPE
CABLE TENSION WORKING LOAD LIMIT
CHANGE ONE VARIABLEHOOK DISTANCE FROM HINGE (m)
— kN

Drag on the graph to adjust the selected parameter. The dashed line is the manufacturer's rated limit, not a prediction of cable force.

YOUR ENGINEERING ASSESSMENT

Eight challenges.
One stronger intuition.

Each session is generated from fresh, solvable crane scenarios. Answer with your calculations or with the live instruments.

COMPLETED
0/ 8
YOUR ENGINEERING SCORE
CHALLENGE 01INTERMEDIATECALCULATION
READY TO SOLVE

Generating challenges...

LEARNING TARGETS / 03

What you can discover.

  1. Explain why moving a load farther from the hinge increases its turning moment.
  2. Calculate equilibrium cable tension using moments and the cable angle.
  3. Evaluate a lifting setup by comparing cable tension with its rated working load limit.
THE PHYSICS UNDER THE HOOD

Real equations. Clear limits.

M = Wloadx + WjibL/2
T = M / (L sin θ)
θ = tan−1(a / L)

Assumptions: the jib is rigid, horizontal and uniformly weighted; the steel backstay is massless and taut; the load is stationary or moves at nearly constant speed; no wind, bending, friction or dynamic shock loads. The cable’s working load limit is user-specified. This is an educational static-equilibrium model, not a certified crane design tool.

Real-world use: tower cranes, temporary hoists and lifting plans rely on load position, leverage, supporting force and rated capacity. Real lifting also requires stability and structural checks not represented here.

Made with 🤖 ChatGPT · Three.js