M·MYSIMULATOR.UK
AFRICAN FIELD STUDIES / 042RIDGE / RELAY
RWANDA · WESTERN HIGHLANDS LIVE SIMULATION
INTERACTIVE ENGINEERING LAB LAB 01 / TRANSPORT SYSTEMS

Across the green divide.

Engineer a counter-moving cargo ropeway above a fictional highland tea valley. Keep the load moving, the line clear and the energy in check.

EXPERIMENT STATUSREADY TO DISPATCH01 / 04 crossings · dry season baseline
RW–HIGHLANDS / VIRTUAL TEST SITE
INITIALISING 3D
FIG 01 / ELEVATION MODEL
N ↗
DRAG TO ORBITSCROLL TO ZOOMSHIFT + DRAG TO PAN
02 / TELEMETRY STREAMLAST 70 SECONDS
Clearance, m Cabin sway, ° Drive power, kW
Awaiting dispatchMODEL DATA · NOT A SAFETY CERTIFICATION
03 / MISSION BRIEFFOUR CROSSINGS
0/4
Safe deliveriesMaintain a clear, stable line
Delivered cargo0 / 1,400 kg
Maximum sway≤ 10°
Minimum clearance≥ 8 m
Peak drive / line load≤ 10 kW / 195 kN
Complete four safe crossings and deliver at least 1,400 kg of cargo.
FIELD GUIDE / EXPERIMENT 01

Operate the highland relay

This entirely fictional facility is inspired by the steep, tea-growing highlands of western Rwanda. It does not depict an existing ropeway, named estate, surveyed valley or approved transport design.

01 — Prepare

Choose weather, payload, horizontal cable tension, haul speed and anti-sway damping. A tauter cable gives less sag but raises line load.

02 — Dispatch

Send the twin cabins across the valley. They move in opposite directions. The loaded direction alternates between west and east on each crossing.

03 — Observe

Watch minimum clearance, cabin sway, line load and motor demand. The system automatically slows towards the receiving station. Use Hold / Resume if needed.

04 — Succeed

Complete four crossings, carry 1,400 kg or more, and remain within the limits. Unsafe crossings can be retried; all readings and decisions are synthetic.

Camera: Drag = orbit · Scroll / pinch = zoom · Shift + drag / right drag = pan · Hotspots = explanations · Keys 1–4 = view presets · Space = hold/resume
Context: Visit Rwanda — Tea · Cable sag approximation. The model omits full catenary, tower flexibility, fatigue, cable dynamics and certified safety factors.
Made with 🤖 ChatGPT · Three.js