ACTIVE SIGNALPre-lift check
C01 is beneath the gantry. Press Space to attach the spreader and begin your first lift.
SIMULATED SHIFT00:00
C01 is beneath the gantry. Press Space to attach the spreader and begin your first lift.
Move the gantry east–west, the trolley north–south, and the hoist up and down. Drag directly on the 3D scene to orbit your camera. Use the four camera presets to check clearances.
Keyboard: ← / → move gantry; A / D move trolley; W / S raise/lower; Space latch/release; P pause; 1–4 change camera. These are teaching-scale dynamics, not instructions for operating industrial machinery.