IRONHEART / BF–3200
Integrated steelworks digital twin · MySimulator.uk
8,240t steel / day
1,475°Tap temperature
312MW demand
12Process zones
PLANT OPERATIONAL
Facility inspector
Whole steelworks
Select a process zone to inspect its machinery and operating specifications. Click equipment or use the process navigator.
Site footprint3.6 × 2.6 km
Process stageINTEGRATED
Operating load82%
ORBIT Left drag · PAN Right drag / Shift + drag · ZOOM Scroll · SELECT Click facility · MOVE WASD · RESET R · TOUR T
⬤ Orange — hot processes
⬤ Blue — utilities
⬤ Green — logistics