The simplified equations
For a uniformly distributed vertical line load w (kN/m), bridge span L (m), and effective rise f (m):
V = wL / 2
H ≈ wL² / (8f)
R = √(V² + H²)
We use L = 30.6 m, f = 15.3 m, and an assumed baseline line load of 6 kN/m plus the control value. The thrust formula is for a parabolic funicular arch under uniform horizontal loading, applied here as a teaching approximation to a semicircular iron arch. No stress, deformation, material strength or failure estimate is implied.
A separate numerical midspan moment calculation sums 128 equal discrete gravity forces. The independently evaluated H value should closely match the closed-form result.
Evidence levels
Documented: Severn location; five main ribs; approximately 30.6-m span; major castings; carpentry-style joints; 1779 completion; 1781 opening.
Scholarly reconstruction: principal rib geometry and concentric inner arches drawn from listing descriptions and conservation accounts.
Artistic interpretation: colour variation, schematic joins and brace placement, trees, water, weather, sky and simplified stonework. Surrounding landscape is evocative rather than surveyed.
Educational reconstruction; details marked as reconstruction are interpretive.
Sources