M.MySimulator.ukINTERACTIVE LABORATORIES
AFRICAN ENGINEERING SERIESZAMBIA ● COPPERBELT PROVINCE
FIELD LAB / 001
VIRTUAL ENGINEERING EXPEDITION 01 / ZM

DEEP CURRENT.

A living cutaway of an underground airflow system. Guide fresh air through rock, machinery and working galleries.

12.8° S / 28.2° E
FICTIONAL FIELD SITE
INITIALISING 3D ENGINE/ISOMETRIC CUTAWAY
SYSTEM PRESSURE
— PaPRESSURISED LOOP
FRESH AIR RETURN AIR DUST SOURCE
Preparing the geological cutaway…
LIVE DISTRICT MONITOR
THREE ZONES · INDEPENDENT DAMPERS
LIVE SENSOR HISTORY

Airborne dust index / 90 min

Stope Drive Service
0 MIN30 MIN60 MIN90 MIN
DISTRICT INSPECTION / 01

Ore stope

An active extraction area with the greatest hypothetical airborne dust and heat load. Prioritise delivery without starving the other galleries.

HEAT: —AIR: —
FIELD GUIDE / 001

How to run the experiment

The fictional mine has one fresh-air intake, three regulated work districts and one shared exhaust. Adjust the main fan and each damper to distribute air. Dust and heat respond over time.

  1. Select a shift programme. Conditions include a time-dependent disturbance.
  2. Adjust the fan, branch regulators and inlet filter. Compare the independent sensors.
  3. Start the 90-minute shift. Aim for at least 75 compliant minutes across all zones and 52 kWh or less.
  4. Use a short purge for an event, but watch the energy budget. Export a CSV of minute-by-minute readings.
3D VIEWLeft drag: orbit · Right drag: pan · Wheel/pinch: zoom · 1/2/3: inspect a district · Space: play/pause · R: reset · Esc: close

This is an educational abstraction. Its indices and thresholds are not medical, occupational or legal exposure limits. No genuine mine layout is depicted.

Made with 🤖 ChatGPT · Three.js