MYSIMULATOR.UK
Field systems · engineering series
LAB ONLINE
ZAMBIA / COPPERBELT
BUILD 6831049271
Underground systems · ventilation engineering

AIR / SHAFT — Copperbelt Laboratory

Balance fresh-air delivery through a fictional underground copper mine. Tune the fans, open the regulators and trace how each decision changes the airflow network.

Underground ventilation network
Preparing interactive 3D environment…
LEVEL 480 · TEACHING SECTION
AIRFLOW FIELD · ACTIVE
Fresh airReturn airAttention
Drag to orbit · Scroll to zoom · Select a marker to inspect
Total airflow41.2 m³/s
Fan power278 kW
Network pressure1.42 kPa*
Elapsed shift00:00 hrs
Made with 🤖 ChatGPT · Three.js