Suspension bridge under load (3D)

Trucks, cars and temperature deform a 240 m suspension bridge: cable tension, deck deflection and girder bending from the deflection theory.

Switch to 2D

Presets

Playback

Bridge design

Load and traffic

Camera

Layers

Quality

Model check

The science

What is shown

A 240 m main-span suspension bridge: two main cables hang from tower saddles, vertical hangers carry a stiffening truss girder, back-stays run to concrete anchorages. Add trucks, cars, crowd load or a temperature change and the page solves the static deformation with the linearised deflection theory of suspension bridges (Melan/Timoshenko).

Equations used

  • Dead-load cable (parabola): H_w = w L^2 / (8 f), cable tension T = H sqrt(1 + y'^2); the deck is built so that the girder carries no bending under dead load.
  • Live load p(x) adds a horizontal cable force h and a deflection eta(x): EI eta'''' - (H_w + h) eta'' = p(x) - h w / H_w.
  • Compatibility (the cable can only change length by stretch or temperature): (w / H_w) Int eta dx = h L_e / (E A) + alpha dT L_t, with L_t = L (1 + 8 n^2 / 3), L_e = L (1 + 8 n^2), n = f / L.
  • Solved with 80 sine modes: eta_n = (p_n - h (w / H_w) c_n) / (EI k^4 + (H_w + h) k^2), k = n pi / L; h is found by bisection on the compatibility equation.
  • Girder bending moment M = -EI eta''; hanger force per length g = (H_w + h) (w / H_w - eta''); tower compression is the vertical part of the main-cable and back-stay tension.
  • Serviceability limit: deflection under live load below L / 800; cable safety factor against 1600 MPa bridge wire.

Honest simplifications

The theory is linear in the live-load deflection and assumes inextensible hangers, rigid towers and back-stays, a symmetric cable, a simply supported girder at the towers and one load state (no dynamic effects, wind, flutter or fatigue; see the Tacoma Narrows simulation for aerodynamic instability). Trucks are two-point loads, cars single points; vehicles on the side spans load the piers instead. Bridge numbers (240 m span, 70 kN/m, EI 1.5e11 N m2) are illustrative, not a specific bridge.

Things to try

  • Park six heavy trucks at a quarter span and compare EI x 0.03 with EI x 8: a flexible deck deforms in a local kink, a stiff girder spreads the load.
  • Warm the bridge by 40 K: the cables lengthen, the whole deck sags a few decimetres and H falls.
  • Halve the cable area under full load and watch the safety factor.
Loading model...
Loading Blender model...
Deck deflection along the main span (blue) with the L/800 limit
Girder bending moment along the main span
Tension in one main cable along the span