What is shown
A 240 m main-span suspension bridge: two main cables hang from tower saddles, vertical hangers carry a stiffening truss girder, back-stays run to concrete anchorages. Add trucks, cars, crowd load or a temperature change and the page solves the static deformation with the linearised deflection theory of suspension bridges (Melan/Timoshenko).
Equations used
- Dead-load cable (parabola):
H_w = w L^2 / (8 f), cable tensionT = H sqrt(1 + y'^2); the deck is built so that the girder carries no bending under dead load. - Live load p(x) adds a horizontal cable force h and a deflection eta(x):
EI eta'''' - (H_w + h) eta'' = p(x) - h w / H_w. - Compatibility (the cable can only change length by stretch or temperature):
(w / H_w) Int eta dx = h L_e / (E A) + alpha dT L_t, withL_t = L (1 + 8 n^2 / 3),L_e = L (1 + 8 n^2), n = f / L. - Solved with 80 sine modes:
eta_n = (p_n - h (w / H_w) c_n) / (EI k^4 + (H_w + h) k^2), k = n pi / L; h is found by bisection on the compatibility equation. - Girder bending moment
M = -EI eta''; hanger force per lengthg = (H_w + h) (w / H_w - eta''); tower compression is the vertical part of the main-cable and back-stay tension. - Serviceability limit: deflection under live load below
L / 800; cable safety factor against 1600 MPa bridge wire.
Honest simplifications
The theory is linear in the live-load deflection and assumes inextensible hangers, rigid towers and back-stays, a symmetric cable, a simply supported girder at the towers and one load state (no dynamic effects, wind, flutter or fatigue; see the Tacoma Narrows simulation for aerodynamic instability). Trucks are two-point loads, cars single points; vehicles on the side spans load the piers instead. Bridge numbers (240 m span, 70 kN/m, EI 1.5e11 N m2) are illustrative, not a specific bridge.
Things to try
- Park six heavy trucks at a quarter span and compare EI x 0.03 with EI x 8: a flexible deck deforms in a local kink, a stiff girder spreads the load.
- Warm the bridge by 40 K: the cables lengthen, the whole deck sags a few decimetres and H falls.
- Halve the cable area under full load and watch the safety factor.