Stope fill coloured by cure, with pressure on the barricade
Barricade pressure over time vs rating

Cemented Backfill in a Stope: Barricade Load Over Time and Layer Curing (2D)

Fill a mine stope with cemented backfill layer by layer and watch the pressure on the barricade at the base. Change stope width, fill height, filling rate, binder content, curing temperature, fill weight, friction and the barricade rating to see wall arching, the strength gain of each layer, the peak load and the safety factor. A Blender-built stope, fill layers, barricade and gauge, with numerical checks of the arching equation and the layered solver built in.

Made with 🟠 Blender