SIMULATION ENGINEPreparing the solar megastructure…Building 1,260 tracking heliostats and seven engineering subsystems
MY SIMULATOR / INFRASTRUCTURE LAB

SOLVANTA / HT–900

LIVE DIGITAL TWIN
GRID OUTPUT0.0 MWₑ
TELEMETRY SOLAR + STORAGE
THERMAL BUFFER0%
DIRECT NORMAL0W/m²
RECEIVER TEMP.0°C
ROTOR SPEED0rpm
228 / 420 MWhₜₕ
COMPONENT INSPECTION
01

Receiver citadel

Central energy receiver.

392 m
DRAG TO ORBIT · SCROLL TO ZOOM · SELECT TO INSPECT · KEYS 1–6 TO JUMP
Made with 🤖 ChatGPT · Three.js