MYSIMULATOR.UK
African systems laboratory
Interactive model
Angola · Kwanza basin
Build 01.01
Energy systems / dispatch laboratory

KWANZA / HEADROOM

A fictional Kwanza River hydropower control room. Balance generation, storage, sediment and downstream releases as conditions change.
Random seed · Product ID3266043195 · AO-KWANZAHEADROOM
Plant controlsOperator inputs
Operating conditions
165 m³/s
30 m³/s280 m³/s
72%
ClosedFull opening
8%
ClosedFull opening
20%
0 m³/s35 m³/s
120 mg/L
10 mg/L600 mg/L
105 MW
20 MW180 MW
Simulation rate
Hydropower station · 3D field view
Kwanza basin, Angola · conceptual training site
Starting engine
FIELD MODEL / fictional facility
RESERVOIR · 19.0 m
Drag to orbit · Scroll to zoom · Select a glowing marker to inspect plant systems.
ASSEMBLING FIELD MODELPreparing terrain, hydraulic structures and turbine systems
Live plant telemetrySynthetic model
Simulation clockDAY 01 · 06:00
Electrical output
112 MW
Grid coverage 100%
Net head
73 m
Gross hydraulic head
Reservoir level
19.0 m
Operating band 8–26 m
Turbine flow
180 m³/s
Maximum 250 m³/s
Downstream release
205 m³/s
Environmental target ≥ 18 m³/s
Turbine efficiency
90.8 %
Sediment-adjusted
Sediment stored
0.0 kt
Illustrative deposition
12-hour dispatch challenge0 / 12 h
Hold ≥82% demand coverage, ≥18 m³/s downstream release and reservoir level between 8–26 m for 12 consecutive hours.
Recent operating trace
MWLevel
System inspector

Select a field marker

Explore the 3D facility and select a glowing marker to read about the reservoir, spillway, turbine hall or grid connection.

Educational model only. Values are illustrative and are not suitable for real dam operation, grid dispatch or engineering design.
Made with 🤖 ChatGPT · Three.js