INTERACTIVE SYSTEMS STUDYWhere every litre depends on a watt.
PREPAREDDAY 01 · 00:00
INITIALISING VIEW
N
DRAG TO ORBITSCROLL / PINCH TO ZOOMSHIFT + DRAG TO PAN
SITE INSPECTION

Desalination works

Explore equipment by selecting a scene marker.

TIME RATE

Make water. Manage power.

Rotate and zoom the 3D site, inspect facilities, then run a 24-hour water-and-energy study. The cityscape is fictional, not a reconstruction of any operating utility.

How to play

  1. Choose a weather programme and set the desalination production target.
  2. Balance energy from solar, wind, battery storage and grid backup.
  3. Adjust water priority if there is a shortage and keep pipe integrity maintained.
  4. Run the day, study the four mission measures, then experiment again.

Navigation & shortcuts

Drag to orbit, mouse wheel or pinch to zoom, Shift + drag to pan. Select labelled equipment for explanations. Space starts or pauses; R resets; 1–4 select viewpoints. On touch screens use the camera buttons.

Scope of the model

Water demand, energy generation, power constraints, storage, leakage and district allocations use simplified deterministic teaching equations. The model does not calculate real membrane pressure, water quality, grid frequency, environmental discharge or engineering compliance. No operational decisions should rely on it.

Geographical and sector context: IMF climate policy diagnostic and MCC Cabo Verde water project.

Made with 🤖 ChatGPT · Three.js