FIELD MANUAL / ALTITUDE AMPEREOperating the Maloti microgrid
This is a fictional run-of-river system inspired by Lesotho’s mountain landscapes. The landscape, equipment, weather and community are illustrative; no real installation is modelled.
1 / Investigate
Drag the 3D scene to orbit, use the mouse wheel or pinch to zoom, Shift+drag to pan, and select markers for equipment explanations. Camera shortcuts: 1–4.
2 / Operate
Reserve water for the river before opening the intake gate. Change nozzle opening, penstock bore, battery dispatch and the workshop’s daily timetable.
3 / Respond
Watch sediment build up during wet periods. Flushing the screen clears it, but interrupts generation for 15 simulated minutes.
4 / Evaluate
Run for 24 simulated hours. You need reliable power, an adequate river release, battery reserves and energy for productive work. Export a JSON report when finished.
Hydropower modelThe teaching model uses P(kW) = 9.81 × Q(m³/s) × Hnet(m) × η, with simplified friction hf = [fL/D + K] v² / (2g). Demand, runoff and sediment are deterministic invented traces; the visual pipe length is not to scale. No operational, environmental or legal standards are implied.
Background references: Lesotho National Development Corporation — Renewable Energy · Natural Resources Canada — Introduction to Micro-Hydropower.