CO2 plume (size follows emissions)Budget left (1.5 C tank)Warming (thermometer)
Couldn't start the 3D scene.

Remaining Carbon Budget: TCRE Warming, Emission Cuts and Net-Zero Timing

Warming follows the cumulative CO2 ever emitted, so the 1.5 C and 2 C limits are a finite budget to spend. Choose how fast emissions fall, when cuts begin and the climate response (TCRE), and watch a glass budget tank drain, a thermometer rise and a factory plume shrink as wind turbines speed up. Closed-form budgets and RK4 integration are checked against each other.

Made with 🟠 Blender · Three.js