City Residual Load Duration Curve: Solar, Wind, Surplus Hours and Firm Capacity Need

Power a city district with solar panels, wind turbines and an optional battery, and see what is left for firm plants. A synthetic 8760-hour year of demand, sun position and wind sets the residual load R = demand - solar - wind; sorted from the largest to the smallest it becomes the residual load duration curve. Change demand, solar, wind, mean wind speed, battery size and the day shown to read the renewable share, surplus hours, capacity credit and the firm capacity still needed. Blender-built towers, panels, turbines and battery with numerical checks built in.