- Pick Levee breach at the peak and watch the town fill from the breach; then pick Spring flood to see the levee hold.
- Lower Levee height to 1 m: the river overtops the crest instead of breaching it.
- Raise Floodplain roughness (forest): the wave slows and the peak at the gauge arrives later.
- Choose Breach the levee here in Tools and click the levee, or Place sandbags to raise the ground by 1 m.
Hydrology
Valley and levee (restarts)
Levee breach
Tools
Speed
Layers
Model check
The science
What is modelled
A river valley 3.8 km long with a meandering channel, a floodplain, a town behind a levee and a small hamlet on the unprotected bank. A flood wave enters upstream; the page solves the 2-D shallow-water (Saint-Venant) equations on a 112 x 70 grid (34 m cells) and draws the result as a plan map (the 3D twin draws the same model over a Blender-built landscape).
Equations
- Mass:
dh/dt + d(hu)/dx + d(hv)/dy = R - I(R = rain, I = infiltration). - Momentum:
d(hu)/dt + d(hu² + g h²/2)/dx + d(huv)/dy = -g h dz/dx - g n² u|u| / h1/3, and the same for v. - Manning roughness n: channel 0.035, grass and crops about 0.045, forest 2.2 times that, town 0.08 (buildings are represented as extra roughness, not as solid blocks).
- Inflow hydrograph:
Q(t) = Qb + (Qp - Qb) [ (t/tp) exp(1 - t/tp) ]k, peak Qp at t = tp, sharpness k. - Levee breach: the crest cells over the breach width are lowered from crest height to natural ground in a smooth-step over the formation time. The erosion process itself is prescribed, not simulated.
Numerics
Finite volumes with an HLL (Einfeldt) flux and hydrostatic reconstruction, which keeps a lake at rest exactly at rest and handles wet/dry fronts without negative depths. Friction is applied semi-implicitly. The time step follows the CFL rule dt = 0.4 dx / max(|u| + sqrt(g h)). Double precision is used so mass can be audited.
Honest limits
- First-order scheme on 34 m cells: levee crests are one cell wide and wave fronts are smoothed; this is a teaching model, not a flood-risk study.
- No sediment transport, no bridge or culvert hydraulics (the bridge is scenery), no groundwater; infiltration is a constant rate.
- Heights are exaggerated by the slider (default x4) and buildings and trees are drawn larger than life so they stay visible from a kilometre away.
- The damage index uses an illustrative depth-damage curve (damage = (depth / 3 m)0.8, capped at 1, church counted double). It is not a loss estimate.
Independent checks (shown in the page)
- Well-balanced test: lake at rest on random, partly dry ground stays still to round-off.
- Manning test: a separate long channel reaches the analytic normal depth
h = (q n / sqrt(S0))3/5. - Live mass balance of the running simulation: stored volume change equals inflow + rain - infiltration - outflow.