Why an open spandrel?
The bridge has a documented 37.02 m clear span, 7.23 m rise, a main ring about 1.03 m thick and four small shoulder openings. The interactive masonry course layout is a reconstruction, not an archaeological survey.
Live equations
For a parabolic, two-hinged equivalent arch under uniformly distributed vertical loading, use q = q₀ + P/L, H = qL²/(8f), V = qL/2, and R = √(H²+V²). Here q₀ = 120 kN/m is an illustrative engineering assumption, not the actual bridge weight. The real arch is circular segmental, stone is non-tensile, and abutment/temperature effects are not modelled.
The independent horizontal-force check uses Hcheck = VL/(4f) from vertical reaction equilibrium; it must match the primary expression within rounding.
Water calculation
For an idealised wide channel, the Manning equation gives Q = (1/n) A Rh^(2/3) √S, with illustrative width 21 m, bed slope 0.0006, and roughness n = 0.038. The numerical solver finds a depth; the displayed reverse-flow check evaluates Manning again. These numbers are not a flood forecast for the Jiao River.
Evidence levels
Documented: location, Sui date range, main span/rise, rib count, small openings and limestone construction. Reconstructed: visible course divisions, banks, vegetation, transverse rib-by-rib appearance. Artistic: surface weathering, lighting, water and scenic terrain.
Sources
- Zhao County Government — Zhaozhou Bridge
- China Culture — Anji Bridge: The Oldest Extant Bridge in China
- ASCE — Zhaozhou Bridge
- Shijiazhuang Municipal Government — Zhaozhou Bridge
Educational reconstruction; details marked as reconstruction are interpretive.