Equations used
Storage estimate
V = A × h̄
Plan area A = 8,000 m × 2,100 m; h̄ is the adjustable mean depth.
Hydrostatic pressure
p = ρgh
Freshwater density ρ = 1,000 kg/m³; g = 9.81 m/s²; h is the selected mean depth.
Idealised outlet flow
Q = Cᵈ b ∫√(2gy) dy
A numerical midpoint integration is compared with its closed-form integral. Cᵈ = 0.62 and b = 2 m are illustrative teaching assumptions.
What is documented?
- Documented: approximate reservoir dimensions; reported capacity range; clayey-sand embankments; the West Mebon island enclosure and walkway.
- Scholarly reconstruction: the wider catchment, canals, storage and distribution functions; chronology and changing use of the network.
- Artistic interpretation: terrain texture, tree placement, water colour, model scale, gate apparatus and the exposed embankment section.
The vertical scale and the West Mebon details are enlarged for legibility. The cutaway is schematic rather than a surveyed engineering section.
Educational reconstruction; details marked as reconstruction are interpretive.
Sources
- APSARA National Authority, Report on Angkor (2010), section “The western baray”. Open report
- ICOMOS, The Cultural Heritages of Water in Tropical and Subtropical Eastern and South-Eastern Asia (2022), section 5.1. Open study
- Fletcher et al., The water management network of Angkor, Cambodia, Antiquity 82 (2008). Open paper
- Penny et al., Hydrological History of the West Baray, BEFEO 92 (2005). Open article
- Penny et al., Paleoenvironmental history of the West Baray, Angkor (Cambodia), PNAS (2012). Open paper
A research-led educational reconstruction, not an official archaeological model.