MY SIMULATORFIELD SYSTEMS LAB · 04
WATERWORKS / HYDRAULICSGOLDEN HOUR · WINDYADULT LAB
CAMBRIDGE FIELD STATION · WATER LOOP 07

The Golden Hour
Waterworks

Keep the upper cistern steady while the greenhouse drinks.

—L/s · delivered
—bar · gauge
—% · usable volume
—m · pump head
—kW · approx.
—% · shift average
MISSION: Hold the cistern between 45–82%, meet crop demand and avoid wasting water.
SHIFT 00:00 / 03:00
3D renderer unavailable — scene fallback active
01 / Cistern reserveV · % capacity
02 / Hydraulic outputpressure · flow
Made with 🤖 ChatGPT · Three.js