Take the controls of a 70 metre tower crane. Lift steel columns, beams, floor slabs and glass facade panels from the laydown yard and place them with precision — mind the load chart, the wind and the people on site.
Crane controls
ADSlew the jib left / rightWSTrolley out / in (changes radius)RFHoist up / lower the hook (or ↑↓)QERotate the load (tag lines)SpaceHook on / release the load. Pour concrete over the pit.ShiftFine control (slow, precise)XHold to damp the load swayCCamera: orbit / operator cab / trolley camMouseDrag to orbit, wheel to zoomPMHPause, mute, this help
Goal: pour the foundation, then for every floor place 4 columns, 4 beams, the slab and 4 facade panels. Finish with the roof cap and antenna. Release a load only when its ghost outline turns green. Never swing loads over workers, never exceed the load chart, and set loads down gently.